© RInaldi Enrico Maria
I embed with international project teams to build, lead, and govern BIM functions on large-scale infrastructure and industrial projects.
20+ years experience across Italy, Japan, Kuwait, and Russia. PMP® certified. Available for immediate international relocation.
Currently available — 1 week notice.
© Enrico Maria Rinaldi 2026
What I Deliver

.png)

BIM Governance
Coordination
BIM Team Building
I define the BIM strategy, author the BEP, establish the CDE, and ensure contractual obligations are met throughout the project lifecycle — whether the infrastructure exists when I arrive or needs to be built from zero.
I manage incoming models from engineering contractors and specialist subcontractors, run clash detection and resolution, and maintain coordination continuity even when upstream design packages keep changing.
I assess resource requirements before committing, build teams calibrated to project scale, and establish protocols that outlast my engagement. I don't just deliver — I leave a functioning BIM environment behind.
Project Track Record
03
01
02
€90M Infrastructure — Italy
Kuwait & Moscow — Nikken
Tokyo — AXS Satow
Joined with no BIM infrastructure in place. Built the entire function on a live construction site — hardware procurement, CDE setup on ACC and Dalux, team training, subcontractor coordination, and AS-built model management. Managed four mechanical design iterations across 18 months without losing clash detection continuity.
Three-year delivery of a four-venue cultural complex including a 2,000-seat theatre in Takasaki. Subsequently produced the BIM model of Tokyo Big Sight (55,000 sqm) from original 2D drawings in four days under Olympic deadline pressure.
Embedded within Nikken Sekkei — one of the world's largest architectural practices — on a 127m residential tower in Kuwait City and a seven-building riverside complex in Moscow. Governed outsourced model production, enforced BEP compliance, and managed international client-facing coordination meetings.

HOW I WORK
Embedded. Governance-first. Wherever the project is.
I work on an embedded project basis — on-site or hybrid, typically 12 to 24 months minimum, renewable by project phase.
Before committing I assess resource requirements, agree scope of authority, and establish what BIM infrastructure exists or needs to be built. A BIM Manager without adequate team resourcing becomes a bottleneck, not an asset — so I make this conversation happen upfront, for both our sakes.
I learned how to work in the US, not in Italy. I upgraded in Japan. That sequence shaped everything about how I approach a project — the directness, the precision, the expectation that things are done properly the first time.
Available for immediate relocation internationally. Notice period: one week.
Certifications
Languages
Platforms
PMP® — Project Management Professional #2862565
Autodesk Revit Architecture Certified — 90%+
Autodesk Revit MEP Certified — 90%+
Health & Safety Coordinator — CSP/CSE
Italian - Native
English - C1, IELTS 7.0
Japanese - JLPT N3
Autodesk Construction Cloud
Navisworks Manage
Dalux
Dynamo
IFC open standards
MS Project / Primus / Certus.
Termus/Edifcius
Get in touch
I'm currently available for international project engagements starting within one week. Reach out directly by email
emiliotosco@gmail.com
linkedin.com/in/enricomariarinaldi
Indirizzo
emiliotosco@gmail.com
Reggio Emilia, Italy